New Albula tunnel will be built from July 2015

New Albula tunnel will be built from July 2015

Share this page on Facebook Share this page on Google+ Share this page on Twitter Print this page
Posts: 1. This thread is closed.
Arno
Arno
9254 posts
expert &
moderator
Jun 26, 2015 - 9:31 AM

This is for Swiss railway enthusiasts: the 6 km long Albula tunnel between Preda and Spinas will be replaced. It's the longest tunnel of the Bernina Express route. The new tunnel will be built from July 25, 2015, and should be ready in 8 years. The costs are estimated at CHF 345 million.

The new tunnel will be built right next to the current tunnel, which was opened in 1903. The old tunnel is going to be the future emergency tunnel, and will be connected to the new tunnel in 12 places for evacuations.

Here's a video with more details (commentary in German):
www.youtube.com/watch?v=hakyq9tZSUQ

More about Swiss trains and rail passes

More on MySwissAlps.com

Swiss tips in your mailbox

Sign up to receive our newsletter and the latest forum messages. The best way to prepare for your trip!

Sign up

Get a customized itinerary for your trip

Let Swiss travel consultants create a customized itinerary. They will book your entire trip.

More
© MySwissAlps.com 2002-2017