2 Lakes Bridge and Trift Bridge in April

2 Lakes Bridge and Trift Bridge in April

Print this page
Create an account to receive an e-mail when someone replies to this thread
Posts: 5
This thread is closed. You are welcome to log in and submit a new thread.
Tipptopp
Tipptopp
17 posts
new member
Mar 30, 2018 - 9:25 PM

Hi

Could someone confirm if these 2 bridges will be open or accessible between the 8th to 11th April? We will be staying in Wengen.

Many thanks in advance!

rockoyster
rockoyster
3750 posts
expert
Mar 30, 2018 - 10:14 PM in reply to Tipptopp

Harder Kulm Funicular only starts up on 14 April.

I’d be surprised if Trift Bridge is accessible but someone else can confirm. www.myswitzerland.com/ en-au/are-you-up-to-it.html

Last modified on Mar 30, 2018 - 10:14 PM by rockoyster
Tipptopp
Tipptopp
17 posts
new member
Mar 30, 2018 - 10:31 PM in reply to rockoyster

Ah that’s a shame. Thank you for your reply.

Arno
Arno
10767 posts
expert &
moderator
Mar 31, 2018 - 9:19 AM

Hi Tipptopp,

The gondola to get up to the Trift Bridge won't be operating until late May. But even if it was open it is still a 90 minute walk to actually reach the bridge, and the area won't be accessible due to snow. Sorry! A walk like this is perfect for July to early/mid October usually.

Tipptopp
Tipptopp
17 posts
new member
Mar 31, 2018 - 1:18 PM in reply to Arno

Thanks very much for the info. Guess there’ll be other things to do:)

More on MySwissAlps.com

Swiss tips in your mailbox

Sign up to receive our newsletter and the latest forum messages. The best way to prepare for your trip!

Sign up

Get a customized itinerary for your trip

Let Swiss travel consultants create a customized itinerary. They will book your entire trip.

More
© MySwissAlps.com 2002-2018