Zurich to Milan on EC train – how long is the journey?

Short summary – read this first

A traveler named swissnoob is planning a train trip from Milan to Zurich and noticed a difference in train durations. While they found information suggesting a 3hrs 20mins journey, they only see durations of around 4hrs 17mins online. They're looking for clarity on this discrepancy and if there are any booking issues.

Key takeaways:
  • The Gotthard-Basistunnel is currently undergoing repairs, causing some trains to take a longer, scenic route, adding about an hour to travel time.
  • It's expected that regular train schedules will resume in September 2024, so check timelines if traveling after that.
  • Always verify train timings on official websites like SBB for the most accurate information.
➤ We can plan your Switzerland trip for you. Save time and avoid mistakes! See how it works
InfoAI-generated summary
  • User
    Inactive
    83503 posts
    Reply 1 of 3 • 18 March 2024 at 4:37:27 #1281278

    Hi swissnoob,

    That train usually uses the Gotthard-Basistunnel. A serious derailment inside the tunnel in August last year has necessitated a lengthy period of repairs. It is expected that things will be back to normal from September 2024.

    https://www.swissinfo.ch/eng/business/gotthard-base-tunnel-to-fully-resume-service-in-september-2024/48945910

    In the meantime, most trains are being diverted over the Gotthard mountain route, which takes about an hour longer (and is more scenic).

    Hope this clarifies things!

    Alpenrose

    Switzerland trip planning, the easy way

    ➤ MySwissAlps Plan + Package: tell us what you’re looking for, and we’ll make it happen. Save time, avoid mistakes. See how it works

    swissnoob888
    Participant
    3 posts
    Reply 2 of 3 • 18 March 2024 at 4:51:48 #1281279

    Thank you Alpenrose!

    Annika
    Moderator
    7334 posts
    Reply 3 of 3 • 19 March 2024 at 16:33:54 #1291265

    Hi swissnoob888! A few alternatives to the Gotthard Base Tunnel are listed here: https://www.myswissalps.com/community/thread/gotthard-base-tunnel-mostly-closed-2023-2024/.

  • The thread ‘Zurich to Milan on EC train – how long is the journey?’ is closed to new replies.

About MySwissAlps

We’re passionate tourists and locals. We share tips about how to plan a trip to Switzerland. MySwissAlps was founded in 2002.

Get a free account for a worry-free trip

  • Join our 9150 members and ask us questions in the forum
  • Access to member-only promotions
  • Detailed maps and weather forecasts

Planning your first Switzerland adventure?

Get a jump-start with Annika’s 20-minute e-mail course, “Switzerland for beginners”. Subscribe to our newsletter to unlock the course.